竹林听雨楼吧 关注:43贴子:1,089
  • 4回复贴,共1

01-09-2006

收藏回复

  • 60.50.163.*
PK Warehouse

Ammonium Sulphate    - 18 pallet = 36Tonnes
Egypt Rock Phosphate - 43 Pallet = 86Tonnes
Total = RM4.5X122T = RM549
13 Bangladeshi RM24x13=RM312
4 lorries loading (ERP)=(20X3)+22=82T


1楼2006-09-01 18:52回复
    • 60.50.160.*
    02-09-2006

    PK Warehouse

    Ammonium Sulphate - 10 pallet = 20 Tonnes
    Mixture(SOA+MOP=NK1) - 59 pallet = 118Tonnes
    Total = RM4.5X138T = RM621
    13 Bangladeshi RM24x13=RM312
    4 lorries loading (mixture-NK1)=(20X4)=80T 
     
    Remark :6 new Bangla + philip =bbgold(10T)(Fail)
     including (stacking+rolling+mixing+bagging)jobs 
     :1 Bangla absent
     :Rolland's brother =New forklift operator


    2楼2006-09-02 19:56
    回复
      • 60.50.174.*
      04-09-2006 
      PK Warehouse 

      Ammonium Sulphate - 31 pallet = 62Tonnes 
      Egypt Rock Phosphate - 41 Pallet = 82Tonnes
      Ammonium Sulphate(SOA HARTA FELDA) - 20 Pallet = 40Tonnes
      BB Gold - 10 Pallet = 20Tonnes 
      Total = RM4.5X204T = RM918 
      13 Bangladeshi RM24x19=RM456
      Overtime 7Bangla(1st base except thandu) = 1.5x4.5x7 = RM47.25
       5Bangla(2nd & 3rd base) = 1.0x4.5x5 = RM22.50 
      2 lorries loading (ERP)=(15X2)=30T 
      2 lorries loading (ERP)=(20X2)=40T 
      2 lorries loading (SOA)=(20X2)=40T

      Remark :4 new Bangla + philip =bbgold(20T)including 
       stacking+rolling+floor mixing jobs
       :printing for 20T SOA HARTA FELDA
       :1bangla floor cleaning
       :Thandu absent 1/2 day


      3楼2006-09-04 20:56
      回复
        • 60.53.70.*
        05-09-2006 
        PK Warehouse 

        Ammonium Sulphate(SOA HARTA FELDA) - 41 pallet = 82T 
        Mixture(SOA+MOP=NK1) - 48 pallet = 96T 
        Container stuffing (SOA HARTA FELDA) = 60pallet 18bags(120T900kg) 
        Total = (RM4.5X178T)+(120.9x5) = RM801+RM604.5 = RM1405.5
         
        12 Bangladeshi RM24x12=RM288+RM20(new general worker) = RM308
        6 Bangla RM24X6=RM144-RM12(one absent 1/2 day) = RM132
         
        Overtime 9Bangla(2nd & 3rd base) = 1x4.5x9 = RM40.5 

        1 lorries loading (SOA)=20T 
        1 lorries loading (BBGolg)=20T 
        2 lorries loading (NK1)=(20X2)=40T 

        Remark :Bangla old man absent+1 Bangla(3rd base)absent 1/2day
         :printing for 82T SOA HARTA FELDA & 96T NK1
         :floor mixing for 96T Nk1


        4楼2006-09-05 20:37
        回复