The Arleigh Burke class was designed from the outset with future modifications in mind.
Flight I consisted of USS Arleigh Burke, built at Bath. There was a pause after her construction for evaluation.
Flight IA commenced with Barry, launched from Pascagoula, and included the 20 ships commissioned through 1997.
Flight II consisted of seven ships authorized in fiscal year 1992. Commissioned in 1998 and 1999, they incorporated improvements to the SPY radar, Standard missile, active electronic countermeasures and communications systems.
Flight I consisted of USS Arleigh Burke, built at Bath. There was a pause after her construction for evaluation.
Flight IA commenced with Barry, launched from Pascagoula, and included the 20 ships commissioned through 1997.
Flight II consisted of seven ships authorized in fiscal year 1992. Commissioned in 1998 and 1999, they incorporated improvements to the SPY radar, Standard missile, active electronic countermeasures and communications systems.